Meet the Airco Mechanical Team

A man with long white hair and glasses.

Wyatt Jones

President

Team Member since 1994

Mr. Jones has experience in almost every department at Airco Mechanical, Inc. He has been a team member at Airco Mechanical, Inc. since 1994. Raised in the construction industry, Mr. Jones holds his own Contractor's License. In addition to his tenure at Airco, Mr. Jones spent a number of years working in the capacity of a superintendent and project manager for a local general contracting firm.

[email protected]

A woman in black jacket standing next to red wall.

Joann Hillenbrand, CCIFP

Chief Financial Officer

Team Member since 2012

As CFO, Ms. Hillenbrand oversees all aspects of finances, including accounting, reporting, surety, banking, risk management and human resources. Joann has held financial management positions over the course of her career for both specialty contractors and general contractors.

[email protected]

A man in a suit and tie standing inside of a warehouse.

Christopher Barker, P.E., LEED® AP

Director of Preconstruction

Team Member since 2000

As Engineering Department Manager, Mr. Barker designs HVAC, piping, and plumbing systems for Institutional, healthcare, industrial, food service, educational, and commercial projects. Specific systems designed include a chiller, hydronic heating, double duct variable air volume, hot water reheat variable air volume, steam piping, industrial ventilation, plumbing, laboratory gas systems, and medical gas systems.

[email protected]

A man in a suit and tie standing next to a building.

Cory Bangs

Director of Special Projects & Service

Team Member since 2002

Cory Bangs is a distinguished leader of Airco Mechanical’s Special Projects and Service Divisions in both our Sacramento Valley and Bay Area Markets. He uses his more than 25 years of industry experience to guide his division’s strategic direction while ensuring operational efficiency across the board. At the core of Cory’s leadership philosophy is a strong emphasis on client satisfaction. His teams operate in a wide spectrum of high-profile, mission-critical facilities which require an extra level of attention. His commitment to transparency and integrity ensures that clients receive honest and reliable results which reinforces Airco Mechanical’s position as a trusted partner in the industry.

[email protected]

Joe Vicochea_1

Joe Vicochea

Director of Operations

Team Member since 2023

[email protected]

Axel Perron_2

Axel Perron

Director of Construction

Team Member since 2000

[email protected]

A man in a suit standing next to a machine.

Shawn Goutermont

Chief Estimator

Team Member since 2015

Mr. Goutermont has been in the construction industry since 1996 and has worked in the mechanical trades for over 20 years. As our chief estimator, Shawn oversees the estimating department at Airco Mechanical and is responsible for all estimates that Airco produces.

[email protected]

A man with beard and checkered shirt in factory.

David De La Cruz

Safety Manager

Team Member since 2021

David Brings 10 years of safety experience to the team as Airco's Safety Manager and is eager to share his knowledge. David's responsibilities include ensuring all personnel understand Airco's commitment to safety and that our employees are in compliance with all regulations issued by the Occupational Safety and Health Administration (OSHA). David works closely with the superintendents and foremen to mitigate safety risks.

[email protected]